Fuel Filter and line from tank installed


Fuel Filter and line from tank installed. Next up fuel lines and Brake lines

Passenger footbox




Passenger footbox is riveted into place

Right Rear Brake causes trouble


Once I finished the rear brake install, I felt that it would be prudent to ensure that the brake bleeder screws were loosened and ready to go when it came time to bleed the brakes. The driver side went just fine, however, when I went to the passenger side the bleeder screw broke off. I had to replace the wheel cylinder. I am happy tp report that the brakes are complete again

Sunday, January 13, 2008

Rear Brakes installed




Rear Brakes installed

Front brake assemblies go together. Wheel bearings packed, rotors and calipers installed


Gas tank gets installed along with fuel filter

Sunday, December 30, 2007






Rear Axle assembly is prepared and istalled over the holiday week. Spring perches are installed along with Axle dampers (quad shocks). An examination of the rear brakes shows there will be work required here.

Sunday, December 9, 2007


The AC brake and clutch pedals re installed. Th easy part: drilling and bolting them o. The hard part: getting the little black rubber bushings installed into the pedal themselves.

The Kit did not come with a Gas Pedal, so I built one myself.

I think it looks pretty good



Brake Master Cylinder, Steering Column Assemby, are installed. It Steers!

Sunday, December 2, 2007



We have floors. The floorboards were installed both driver and passenger. Pop rivits were used to install the panels.



Clutch and Brake Pedal assembly get installed along with the Driver footbox panel.

Brake Calipers get ready, Brake rotors are sent out to the machine shop to be turned. Steering column that we ordered last week was wrong. We are still waiting for the replacement

Sunday, November 25, 2007


Heat in the Garage. As the temperature drops in Northeast Ohio, we can continue to make progress by using this nice little space heater. The Grage is insulated and as long as the outside temperature stays above 20 degrees we can work.

Clutch and Brake Pedals Get Bent! These needed to get bent to provide clearance for the wide of foot to be able to hit the gas pedal without hitting the brake.

Steering rack is installed.


Front Suspension begins to take shape. We ventured into the first of many boxes. I assembled the upper contol arms and shock assemblies. The parts were mated to the Lower control arms from the mustang and attached to the car as you see here.


COnstruction begins. Aluminum Side panels are attached to frame. Firewall is also attached. These panels are attached using pop rivits.

Sunday, August 26, 2007




Transmission and steering rack get some aluminum coating


Photo one shows us using our new favorite tool the needle scaler. Photo two shows the primed rear axle assembly.